Upper Lachlan Shire Council - Bridge Replacement over Abercrombie River

Last Friday Works and Engineering Director, Chris Schumacher and General Manager, Alan Cairney met on-site with Engineering Staff from Upper Lachlan Shire Council to discuss their successful Fixing Country Roads Program, and the construction of a new river crossing.   A new Concrete Box Culvert structure will be located 13m downstream of the old bridge, with construction expected to commence in October.  We will be doing work on our side of the Abercrombie River.